Résultats

55 résultats trouvés pour « circuit around the reservoir »

Information at end 2014 presented in the Reference Document

6 1 4 Investment policy 6 1 4 1 Investments in 2014 The Group continued its gross operating investments programme in the amount of 13 6 billion in 2014 (excluding the Linky project of smart meters... In addition, through its engineering, it provides technical and industrial skills to the entire Group in these three fields (see section 6 3 "(Presentation of EDF group' s' international business.

The 2021 EMTN Base Prospectus

implementing the action plan on a hundred welding seams to be reworked on the main secondary circuit piping (VPP and ARE4,) as well as those of the 8 containment crossings for which ASN has requested immediate repair... or corrective actions under study and their validation by the ASN following the incomplete observance of the 2006 study handbook for the location of the installation of three nozzles on the main primary circuit in respect of which a significant event was declared to the ASN on 2 March 2021 ;the re-

The 2014 reference document

6 1 4 Investment policy 6 1 4 1 Investments in 2014 The Group continued its gross operating investments programme in the amount of 13 6 billion in 2014 (excluding the Linky project of smart meters... In addition, through its engineering, it provides technical and industrial skills to the entire Group in these three fields (see section 6 3 "(Presentation of EDF group' s' international business.

H1_2016_financial_report

Reducing operating expenses The EDF Group has already reduced costs by around 300 million between 2014 and 2015, and during the presentation of its annual results on 16 February 2016 announced a cost-cutting objective of 700m between 2015 and 2018... The Group has set itself the target of selling around 10 billion of assets between 2015 and 2020, including a sale of some of RTE' s capital, thermal power generation assets outside France and minority shareholdings. 3 4 FLAMANVILLE EPR.

2007 reference document

Before 1946, the electricity sector had developed around numerous local companies across France... the Group' s medium-term aggregate requirements are estimated at around 45 Gm3... It is organized around three major areas: nuclear power, hydropower and fossil-fired power... This investment and maintenance program involves an investment of around 600 million over a period of 5 years.

Saisissez votre texte :
Haut de page