This role allows direct control of the design and operation of its power plants, the organisation of development projects, the schedule and costs of construction, its relations with the ASN and the direct integration of operating feedback... The overall availability of the hydropower fleet, i. e., the percentage of time over the year during which the power plants are available at full capacity, was 79 4 % in 2014, remaining stable compared with 2013.