GRAVELINES 2

  • Current version of the outage - v27
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Active
      Publication date : 29/12/2017 20:12:10
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 29/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v26
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/12/2017 17:48:19
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 29/12/2017 20:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v25
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/12/2017 17:24:09
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 29/12/2017 22:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v24
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/12/2017 02:54:11
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 29/12/2017 17:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v23
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/12/2017 23:01:19
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 29/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v22
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/12/2017 09:24:14
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 28/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v21
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/12/2017 08:06:09
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 27/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v20
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/12/2017 19:12:50
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 26/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v19
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 23/12/2017 05:15:20
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 25/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v18
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 20/12/2017 04:07:09
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 24/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v17
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 15/12/2017 08:01:17
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 21/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v16
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 11/12/2017 22:30:19
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 18/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v15
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 08/12/2017 03:06:11
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 15/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v14
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/11/2017 09:57:09
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 12/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v13
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 09/11/2017 19:24:10
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 03/12/2017 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v12
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 01/10/2017 08:39:06
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 27/11/2017 00:30:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v10
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 20/09/2017 07:51:05
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 00:30:00
      and the : 27/11/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v9
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 12/05/2017 10:45:12
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 00:00:00
      and the : 27/11/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v8
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/03/2017 14:41:10
      Cause : Complementary informations
      Complementary informations :
      After its re-start, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 27/11/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v7
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 30/11/2016 15:38:59
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 30/09/2017 02:00:00
      and the : 01/12/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v6
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 12/10/2016 15:51:33
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 24/06/2017 02:00:00
      and the : 25/08/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v5
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 08/07/2016 17:00:39
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 17/06/2017 02:00:00
      and the : 18/08/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v4
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 01/03/2016 17:42:05
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 17/06/2017 02:00:00
      and the : 20/08/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v3
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 31/07/2015 17:57:14
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 17/06/2017 02:00:00
      and the : 19/08/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v2
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 19/06/2015 15:24:05
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 24/06/2017 02:00:00
      and the : 23/08/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 17/02/2015 17:39:38
      Cause : Complementary informations
      Complementary informations :
      After its re-coupling, the plant will gradually return by various load threshold to full power. The ramp-up period may take several days.
      --
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée peut prendre plusieurs jours.
      Between the : 05/08/2017 02:00:00
      and the : 04/10/2017 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset.