- Current version of the outage - v2
- Entity : GenerationName : BATHIE 6Sector : Hydro Water ReservoirLocation : FranceMarket FranceType : PlannedStatus : ActivePublication date : 04/12/2020 16:25:06Cause : Complementary informationsComplementary informations :
Des variations de puissance pour essais sont possibles --- Power variations are expected due to testsBetween the : 03/12/2020 09:00:00and the : 03/12/2020 17:00:000.00 MWMW AVAILABLE POWER100 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
- Earlier version of the outage - v1
- Entity : GenerationName : BATHIE 6Sector : Hydro Water ReservoirLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/11/2020 17:08:07Cause : Complementary informationsComplementary informations :
Des variations de puissance pour essais sont possibles --- Power variations are expected due to testsBetween the : 03/12/2020 09:00:00and the : 03/12/2020 17:00:000.00 MWMW AVAILABLE POWER100 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.