Search Results

8 résultats trouvés pour « mobile units »

Our key figures | EDF Cyclife

of ion exchange resins treated by MERCURE mobile units on nuclear sites... of ion exchange resins treated by MERCURE mobile units on nuclear sites since 1996.

  1. Edf.fr
  2. Cyclife
  3. Our governance
  4. Cyclife France
  5. About us

On site services | EDF Cyclife

Cyclife France also operates a mobile unit for immobilising radioactive concentrates from the treatment by evaporation of effluents produced by nuclear power plants... Since 1996, the Mercure 1 and 2 mobile units have carried out more than one hundred ion exchange resin encapsulation campaigns, corresponding to a total production of 4 250 cubic metres (as of the end of 2018) at EDF group nuclear power plants and other production sites.

  1. Edf.fr
  2. Cyclife
  3. Our governance
  4. Cyclife France
  5. Our solutions

Discover the Swedish subsidiary of Cyclife based in Nyköping | EDF Cyclife

Cyclife Sweden has multiple ways to characterise materials and waste: A well equipped analytical laboratory in which chemical and radiological analyses are performed, secondary waste characterisation station, a highly shielded clearance measurement facility (capacity 2 500 tons per year) and mobile characterisation units for in-field characterisation services.

  1. Edf.fr
  2. Cyclife
  3. Our governance

Find out EDF Pulse Africa Awards' finalists | EDF Pulse Africa

On-demand consumption with a mobile payment system (MPESA)... AEON Power bag is a backpack / computer bag with an on-board system to remotely power any mobile device through signals emitted by telecommunications transmitters. This tool is for students, teachers, or any mobile device user... This process is carried out using small and medium-sized decentralized fermentation units for local processing of available organic waste (agricultural waste, household waste, etc .) into biogas.

  1. Edf.fr
  2. EDF Pulse Africa
  3. News

EDF close to me | EDF FR

Mobile dam (height 19 3 m and length 105 m) on the Dordogne river... It operates from a drop height of 1270 m . It is equipped with 1 production unit making it possible to produce the electricity needed by nearly 27 400 people each year... Mobile dam at the confluence of the Verdon and the Durance, flooded in 1961, 15 m high and 152 m long.

  1. Edf.fr
  2. The EDF Group

Enter your text :
Back to top