Search Results

75 résultats trouvés pour « installation of a station »

Engineering | EDF Cyclife

Design and installation at Centraco of a transfer station for alpha-contaminated effluents. Customer.

  1. Edf.fr
  2. Cyclife
  3. Our governance
  4. Cyclife France
  5. Our solutions

Our responsibility | EDF Cyclife

The plant's design features ensure that, even in the event of failure of both barriers, the dose received by the local population would remain below 1 milliSievert (the annual exposure limit for populations living in the vicinity of nuclear installations). As a responsible industrial company, Cyclife France has been committed to environmental management since 2003, evidenced in the fact that it has obtained ISO 14001 certification in recognition of its continuous improvement in environmental matters.

  1. Edf.fr
  2. Cyclife
  3. Our governance
  4. Cyclife France
  5. About us

The EDF Group has inaugurated two ground breaking energy transition projects in the United Kingdom: the off-shore wind farm in Blyth and the battery storage facility in West Burton | EDF Asie

The 49 MW battery storage facility located at West Burton B power station is the largest project in the new frequency control system which will be deployed across the UK to improve stability of the national grid... They are both consistent with our CAP 2030 strategy, which aims to double EDF Group renewable energy generation by the year 2030 and our Electricity Storage Plan with the installation of 10 GW of new storage facilities supporting the electricity systems by the year 2035.

  1. Edf.fr
  2. EDF in Asia
  3. News

EDF intends to become Europe's leading e-mobility energy company by 2022. | EDF Asie

EDF and Toyota have been electric mobility partners with a focus on R&D since 2007 and have extended this partnership to low-carbon industrial performance on the Onnaing site in Valenciennes since 2017 . The expertise of both EDF and Toyota is now opening the way to new cooperative endeavours in the areas of smart charging and hydrogen charging station specifications.

  1. Edf.fr
  2. EDF in Asia
  3. News

EDF Transmission Network Engineering Projects in the Middle East

the construction of a 400 kV evacuation station for Unit 2 of the plant... In order to meet this challenge, EDF Transmission Network Engineering supervised the installation of two 400 kV underground connections between Mamzar and Dubai. Building an Evacuation Station and Integrating a Nuclear Power Plant into a National Network.

  1. Edf.fr
  2. EDF in Middle East
  3. Activities
  4. Engineering
  5. Transmission Network Engineering

DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant | EDF Middle East

It also includes consultancy on deep-water tunnel designs, the dam and hydroelectric power station, the tender for material supply, supervision of construction work, site installation, on-site testing and commissioning. The signing ceremony was attended by HE Benjamin Grivaux, the French Secretary of State to the Minister of Economy and Finance and HE Eng . Mohammed Ahmed Bin Abdul Aziz Al Shehhi, Undersecretary for Economic Affairs in the Ministry of Economy of the UAE .

  1. Edf.fr
  2. EDF in Middle East
  3. News

Transmission and Distribution

EDF oversaw the installation of five transformer stations 132 / 11kV in Dubai, the construction of the 400 kV substation of Barakkah nuclear power plant (Abu Dhabi) and the engineering of 15km of underground cables and a 400 kV in Mamzar Project (Dubai). The Group drafted also the tenders documents for the construction of three 220 kV medium voltage urban substation in Lebanon .

  1. Edf.fr
  2. EDF in Middle East
  3. Activities

DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant | Émirats Arabes Unis

It also includes consultancy on deep-water tunnel designs, the dam and hydroelectric power station, the tender for material supply, supervision of construction work, site installation, on-site testing and commissioning. The signing ceremony was attended by HE Benjamin Grivaux, the French Secretary of State to the Minister of Economy and Finance and HE Eng . Mohammed Ahmed Bin Abdul Aziz Al Shehhi, Undersecretary for Economic Affairs in the Ministry of Economy of the UAE .

  1. Edf.fr
  2. Émirats Arabes Unis
  3. Our activities
  4. News

Transmission Networks | Émirats Arabes Unis

EDF won a contract for building the evacuation station of units 3 and 4 of the Barakah power plant... Our teams supported the installation of several new 400 kV substations for DEWA and TRANSCO and completed the first project for a 400 kV underground link in Dubai. CIST is focusing on several potential projects in the UAE, such as burying 130km of 400 kV lines or installing submarine cables to connect islands or offshore platforms to the mainland.

  1. Edf.fr
  2. Émirats Arabes Unis
  3. Our activities

Our news and projects | Hynamics

First-phase installation of a 1 MW renewable hydrogen station for the short circuit supply of 5 buses from the Leo network (Transdev) and light commercial vehicles from autumn 2021 . This station is more widely involved in the creation of a large-scale ecosystem conducive to the emergence of new hydrogen projects to decarbonise uses throughout the territory.

  1. Edf.fr
  2. Hynamics

Our offers for mobility | Hynamics

Our offer: installation of electrolysers and refueling stations. Production of low-carbon and renewable hydrogen and distribution systems for vehicles equipped with fuel cells .

  1. Edf.fr
  2. Hynamics

Future of solar energy : our innovative solutions | EDF Group

The construction of the Toul-Rosières power station in Lorraine, 115 MWp, was accompanied by the decontamination and reconversion of a former military base. EDF makes use of all its R&D expertise and relies on the most innovative partners to improve production, lower costs, facilitate network integration and maintain its photovoltaic plants.

  1. Edf.fr
  2. The EDF Group
  3. Producing a climate-friendly energy
  4. Doubling the share of renewable energies by 2030
  5. Solar energy

DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant | EDF FR

It also includes consultancy on deep-water tunnel designs, the dam and hydroelectric power station, the tender for material supply, supervision of construction work, site installation, on-site testing and commissioning. The signing ceremony was attended by HE Benjamin Grivaux, the French Secretary of State to the Minister of Economy and Finance and HE Eng . Mohammed Ahmed Bin Abdul Aziz Al Shehhi, Undersecretary for Economic Affairs in the Ministry of Economy of the UAE .

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

The EDF Group has inaugurated two ground breaking energy transition projects in the United Kingdom: the off-shore wind farm in Blyth and the battery storage facility in West Burton | EDF FR

The 49 MW battery storage facility located at West Burton B power station is the largest project in the new frequency control system which will be deployed across the UK to improve stability of the national grid... They are both consistent with our CAP 2030 strategy, which aims to double EDF Group renewable energy generation by the year 2030 and our Electricity Storage Plan with the installation of 10 GW of new storage facilities supporting the electricity systems by the year 2035.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Enter your text :
Back to top