It also includes consultancy on deep-water tunnel designs, the dam and hydroelectric power station, the tender for material supply, supervision of construction work, site installation, on-site testing and commissioning. This Hydroelectric Power Station is the first of its kind in the Arabian Gulf, with a total capacity of 250MW, and is expected to last between 60 and 80 years.