Search Results

23 résultats trouvés pour « capacity of 500 MW »

The EDF Group (17 results)

EDF boosts its activities in China with agreements to build and operate two offshore wind farms and to optimize a heating and air-conditioning networks in the city of Wuhan | EDF France

The Dongtai IV and V offshore wind farms account for a total installed capacity of 500 MW and will be the EDF Group's first offshore projects in China... The Dongtain IV projet is currently being built; the construction of Dongtai V is scheduled to begin in 2019 . Subject to the signing of the final contracts, both partners will build and operate a total installed capacity of 500 MW, which will be gradually commissioned by 2021.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

EDF boosts its activities in China with agreements to build and operate two offshore wind farms and to optimize a heating and air-conditioning networks in the city of Wuhan | EDF France

The Dongtai IV and V offshore wind farms account for a total installed capacity of 500 MW and will be the EDF Group's first offshore projects in China... The Dongtain IV projet is currently being built; the construction of Dongtai V is scheduled to begin in 2019 . Subject to the signing of the final contracts, both partners will build and operate a total installed capacity of 500 MW, which will be gradually commissioned by 2021.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

EDF boosts its activities in China with agreements to build and operate two offshore wind farms and to optimize a heating and air-conditioning networks in the city of Wuhan | EDF France

The Dongtai IV and V offshore wind farms account for a total installed capacity of 500 MW and will be the EDF Group's first offshore projects in China... The Dongtain IV projet is currently being built; the construction of Dongtai V is scheduled to begin in 2019 . Subject to the signing of the final contracts, both partners will build and operate a total installed capacity of 500 MW, which will be gradually commissioned by 2021.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

EDF Asie (3 results)

EDF boosts its activities in China with agreements to build and operate two offshore wind farms and to optimize a heating and air-conditioning networks in the city of Wuhan | EDF Asie

The Dongtai IV and V offshore wind farms account for a total installed capacity of 500 MW and will be the EDF Group's first offshore projects in China... The Dongtain IV projet is currently being built; the construction of Dongtai V is scheduled to begin in 2019 . Subject to the signing of the final contracts, both partners will build and operate a total installed capacity of 500 MW, which will be gradually commissioned by 2021.

  1. Edf.fr
  2. EDF in Asia
  3. News

News | EDF Asie

The Dongtai IV and V offshore wind farms account for a total installed capacity of 500 MW and will be the EDF Group's first offshore projects in China... The Dongtain IV projet is currently being built; the construction of Dongtai V is scheduled to begin in 2019 . Subject to the signing of the final contracts, both partners will build and operate a total installed capacity of 500 MW, which will be gradually commissioned by 2021.

  1. Edf.fr
  2. EDF in Asia

The EDF Group has inaugurated two ground breaking energy transition projects in the United Kingdom: the off-shore wind farm in Blyth and the battery storage facility in West Burton | EDF Asie

Located off the Northumberland coast, the Blyth off-shore wind farm is composed of five turbines with total generation capacity of 41 5 MW . Several innovations have been built in to contribute to enhanced competitiveness of off-shore wind power... In Nottinghamshire, West Burton B CCGT power station (1332 MW) is adjacent to West Burton A coal-fired power station (2000 MW) and close to Cottam coal-fired power station (2000 MW) . These plants employ a total of more than 500 persons.

  1. Edf.fr
  2. EDF in Asia
  3. News

EDF Afrique (2 results)

News | EDF Afrique

The project entails the design and construction of a 420- MW hydropower project on the Sanaga river near the Nachtigal Falls, located 65 km to the north-east of aoundé, as well as the operation of this facility for a period of 35 years... The project will generate substantial economic benefits: up to 1 500 direct jobs during peak construction periods, of which 65 % will be locally sourced within a 65- km radius of the construction site.

  1. Edf.fr
  2. EDF in Africa
  3. News

EDF, IFC and the Republic of Cameroon sign final and binding agreements for the construction of the Nachtigal hydroelectric dam in Cameroon. | EDF Afrique

The project entails the design and construction of a 420- MW hydropower project on the Sanaga river near the Nachtigal Falls, located 65 km to the north-east of aoundé, as well as the operation of this facility for a period of 35 years... The project will generate substantial economic benefits: up to 1 500 direct jobs during peak construction periods, of which 65 % will be locally sourced within a 65- km radius of the construction site.

  1. Edf.fr
  2. EDF en Afrique
  3. Actualités

EDF Amériques (1 match)

EDF management team in North and South America

Before this, he was responsible for the industrial and commercial project of Dunkerque LNG, a new LNG terminal located North of France, which is the 2nd largest in continental Europe with an importing capacity amounting to 20 % of French and Belgian gas markets. He has experienced various managerial positions within EDF Group, starting in 1992 in Paris with operations of the electrical network and followed in 1996 with managing a 200 MW thermal power plant in Guadeloupe (French West Indies) .

  1. Edf.fr
  2. EDF in North and South America
  3. About Us
Enter your text :
Back to top