Search Results

4 résultats trouvés pour « Electromechanical assembly »

EDF has strengthened its position in China with two new energy service contracts. | EDF Asie

The expected commercial operation of the reactor will commence in 2018 . Electromechanical assembly is being continued on unit 2, with start-up planned for 2019 . EDF also provides support for the CGN Group with operation of its entire fleet. Renewable energies: in July 2016, EDF Énergies Nouvelles acquired a majority holding (80 %) in the company UPC Asia Wind Management (AWM), which develops and builds wind power plants in China .

  1. Edf.fr
  2. EDF in Asia
  3. News

Edvance | Edvance

Edvance is responsible for the engineering of the nuclear island, as well as for the technical installation, bringing all of its skills to the project: civil engineering studies for the construction, process and equipment specifications for the electromechanical assemblies, preparation of future commissioning tests for the two reactors and verification of the safety of the installation.

  1. Edf.fr
  2. meta-home

EDF has strengthened its position in China with two new energy service contracts. | EDF FR

The expected commercial operation of the reactor will commence in 2018 . Electromechanical assembly is being continued on unit 2, with start-up planned for 2019 . EDF also provides support for the CGN Group with operation of its entire fleet. Renewable energies: in July 2016, EDF Énergies Nouvelles acquired a majority holding (80 %) in the company UPC Asia Wind Management (AWM), which develops and builds wind power plants in China .

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Details on the technical and financial feasibility of dismantling EDF's nuclear power plants in France | EDF FR

The fact finding commission of the French National Assembly's sustainable development and planning committee today presented a report looking at the technical and financial feasibility of dismantling basic nuclear installations... Decommissioning began in 2007 and work is due to be completed in 2022 . All of the electromechanical installations have been decommissioned and EDF is currently working on the last stage, dismantling the reactor vessel.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Enter your text :
Back to top