Search Results

117 résultats trouvés pour « 3 levels »

Generation & engineering | EDF France

This facility, based on new combustion turbine technology, has already hit record efficiency levels... The Flamanville 3 EPR is undergoing commissioning tests in France... EDF is very knowledgeable about what they want and what they don't want and how to achieve a very very high level of quality and good installations.

  1. Edf.fr
  2. The EDF Group
  3. Who we are
  4. Activities

Octopus Lab, taking care of indoor air quality

The machine learning algorithm used by INDALO Supervision analyses these data to forecast pollution levels and protect the health of occupants... His determination to go further led to the launch of Octopus Lab 3 years ago... Climate change is encouraging building occupants to install more and more air-conditioning systems to provide the indoor thermal comfort levels they need.

  1. Edf.fr
  2. The EDF Group
  3. Inventing the future of energy
  4. EDF Pulse Start-up Awards
  5. The finalists for the 2020 edition

EDF has completed the cold functional test phase for the Flamanville EPR | EDF France

EDF is now preparing hot functional testing to be started in July 2018 . The objective is to demonstrate the good working order of the plant by testing components with temperature and pressure levels similar to operating conditions... EDF has confirmed the Flamanville 3 project roadmap announced in September 2015 with fuel loading and start-up of the reactor at the end of the last quarter of 2018 . The Group has also confirmed the cost of the project set at 10 5 billion Euros 1.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Waste Management | EDF Cyclife

Design of temporary waste storage facilities and design studies with Andra for the construction of the French deep geological disposal (Cigéo) dedicated to high level waste... 3 000 tons per year Of recycled waste from melting.

  1. Edf.fr
  2. Cyclife
  3. Our services

Our responsibility | EDF Cyclife

Cyclife France's integrated management system is regularly reviewed and improved on the basis of operating experience, developments at company level, and changes in the industrial and regulatory environment... 3 Actions for industrial safety... Special instrumentation is in place to continuously monitor filters and analyse releases via the plant stack, to ensure that the expected level of efficiency is achieved.

  1. Edf.fr
  2. Cyclife
  3. Our governance
  4. Cyclife France
  5. About us

2019 half-year results | EDF Asie

Net income excluding non- recurring items (3) :euros 1.4bn, -19 4 %... -Record level of EDF Renewable 's portfolio under construction... (3) Net income excluding non- recurring items is not defined by IFRS and does not appear directly in the Group's consolidated income statement... (10) For 2020: depending of the impact, currently under assessment, of the decision of the French Nuclear Authority of 19 June 2019 on the schedule and completion cost of the Flamanville 3 project.

  1. Edf.fr
  2. EDF in Asia
  3. News

EDF has strengthened its position in China with two new energy service contracts. | EDF Asie

The network will supply the touristic area under development, composed of around twenty hotels, shopping centres and a hospital, representing 3 4 million square metres of effective surface area... In 2017, hot functional testing was successfully performed on unit 1, to test the equipment at temperature and pressure levels similar to operating conditions.

  1. Edf.fr
  2. EDF in Asia
  3. News

DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant | EDF Middle East

DEWA signs MoU with Masdar and EDF for Phase 3. DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant... The implementation progress of the third phase, which will produce 800MW, will be complete by 2020 . The third phase will be completed in 3 stages over 16 square kilometres.

  1. Edf.fr
  2. EDF in Middle East
  3. News

DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant | EDF Middle East

DEWA signs MoU with Masdar and EDF for Phase 3. DEWA signs MoU with Masdar and EDF for Phase 3 of Mohammed bin Rashid Al Maktoum Solar Park, and with EDF for Hatta Hydroelectric Plant... The implementation progress of the third phase, which will produce 800MW, will be complete by 2020 . The third phase will be completed in 3 stages over 16 square kilometres.

  1. Edf.fr
  2. EDF in Middle East
  3. News

News | EDF Afrique

The panel also decided to award a special" coup de coeur "prize to Nicolas Sancy for his NANOE project, which provides a collective solution for the production, storage and distribution of solar energy at local level... 3 prizes will be awarded by the Grand Jury in Paris on December 19th 2017.

  1. Edf.fr
  2. EDF in Africa
  3. News