Search Results

1match found for «3 levels»

Welds in the main secondary system of the Flamanville EPR: EDF sets up corrective actions and adjusts schedule and target construction costs | EDF France

These welds do not comply with" the high quality" requirements 3 defined by EDF during the EPR design phase (break preclusion principle). For 10 other welds, EDF has submitted a proposal to the ASN detailing a specific justification method to confirm the high level of safety at the plant throughout its operating life.

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Enter your text :
Back to top