Search Results

7 résultats trouvés pour « 24 th »

EDF launches an inaugural landmark offering of green bonds (OCEANEs Vertes) and announces its intention to issue two new tranches of Euro-denominated Hybrid Notes | EDF France

The Bonds will be issued by way of a placement to qualified investors (within the meaning of Regulation (EU) 2017 / 1129 (as amended", the Prospectus Regulation") )only, in accordance with Article L) 411-2(1of the French Code monétaire et financier, as per the authorization granted by the Company's extraordinary general meeting held on 7 May 2020 (24 th resolution), in France and outside of France (excluding, in particular, the United States of America, Australia, Japan or South Africa) ,without an offer to the public (other than to qualified investors) in any country (including France).

  1. Edf.fr
  2. The EDF Group
  3. Dedicated sections
  4. Journalists
  5. All press releases

Cyclife at the 13th edition of Kontec | EDF Cyclife

From March 22nd to 24 th, CYCLIFE participated to the 13th KONTEC, the international Symposium" conditioning of Radioactive Operational & Decommissioning Wastes", which takes place every two years at Dresden (Germany). Cyclife made one presentation on behalf of the OECD, on the importance of radiological characterisation .

  1. Edf.fr
  2. Cyclife
  3. Our news

Cyclife at the 13th edition of Kontec | EDF Cyclife

From March 22nd to 24 th, CYCLIFE participated to the 13th KONTEC, the international Symposium" conditioning of Radioactive Operational & Decommissioning Wastes", which takes place every two years at Dresden (Germany). Cyclife made one presentation on behalf of the OECD, on the importance of radiological characterisation .

  1. Edf.fr
  2. Cyclife
  3. Our news

The first of two EPR reactors at China's Taishan nuclear power plant enters into commercial operation | EDF Asie

On Friday 14 th of December 2018, CGN and EDF announced, at a joint press conference in Beijing, that unit 1 of Taishan nuclear power plant had become the world's first EPR to enter into commercial operation. This last milestone was reached on Thursday 13 th of December 2018 after the final statutory functional test of continuous operation at full power for 168 hours.

  1. Edf.fr
  2. EDF in Asia
  3. News

News | EDF Asie

Taishan's two reactors are capable of supplying the Chinese power grid with up to 24 TWh of CO2-free electricity a year, tantamount to the annual electricity consumption of 5 million Chinese users, whilst at the same time preventing the emission of 21 million tons of CO2 a year... Electricity generation Nuclear France 203 7TWh, + 0 5 % Nuclear United Kingdom 24 5TWh, -18 8 % Group Renewables 31 4TWh, -23 8 % o / w Hydropower France.

  1. Edf.fr
  2. EDF in Asia

News | EDF Middle East

On Sunday 27 th of January, DEWA organised the Partners Appreciation Ceremony, where they honoured their local and international strategic partners in public and private sectors... The consortium owns the remaining 40 % of Shuaa Energy 2 . Masdar owns 24 % and EDF Energies Nouvelles owns 16 % . The international consortium led by the renewable energy contractor GranSolar from Spain, is handling the engineering procurement and construction (EPC).

  1. Edf.fr
  2. EDF in Middle East

Opening hours and access | Musée Electropolis

-24 th and 31st December, the museum closes at 4:00pm. ENERGY GARDEN: the game" Wake up the sleeping machines" will be paused from December 14 th, 2021 to March 13 th, 2022 .

  1. Edf.fr
  2. Electropolis Museum
  3. Practical information

Enter your text :
Back to top